How Long Does Split System Installation Take?
Split system installation takes 2-4 hours for a standard back-to-back install. The indoor unit mounts on the wall, the outdoor unit sits directly behind, and refrigerant piping connects them through the wall. More complex installs with long pipe runs, switchboard upgrades, or double-storey homes can take 4-6 hours.
What happens on installation day
12-Month Workmanship Guarantee
Every Chillin installation is backed by our guarantee. Hisense 7-year manufacturer warranty included.
Book Your InstallFrequently Asked Questions
Do I need to be home during installation?
Yes, someone over 18 needs to be home to confirm the install location, approve any extras, and sign off on completion. You don't need to be in the same room the whole time — the tech will check in with you at key stages.
Will installation make a mess?
Some dust is unavoidable when drilling through walls, but we lay down protective sheeting and clean up before we leave. Most customers are surprised at how tidy the space looks afterwards.
Can you install two split systems in one day?
Yes, if both are standard back-to-back installs. Two units typically takes 5-6 hours total. We'll confirm timing when you book.
What if it rains on installation day?
Light rain is fine — the outdoor unit is weatherproof. Heavy rain may require rescheduling for safety. We'll contact you the morning of the install if weather is a concern.
Trusted by Queensland homeowners since 1991. Call 07 3801 3269.